{"id":6777,"date":"2025-03-31T15:28:18","date_gmt":"2025-03-31T14:28:18","guid":{"rendered":"http:\/\/www.swgnew.com\/na\/?post_type=case-study&#038;p=6777"},"modified":"2025-06-15T22:16:18","modified_gmt":"2025-06-15T21:16:18","slug":"linkoping-sports-centre","status":"publish","type":"case-study","link":"https:\/\/www.swg.com\/na\/case-studies\/linkoping-sports-centre\/","title":{"rendered":"Lejonfastigheter \u2013 Link\u00f6ping Sports Centre"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Digitisation and BIM modelling of a sports centre to provide Lejonfastigheter with the correct basis for redevelopment<\/strong>.<\/h2>\n\n\n\n<p>Property management company Lejonfastigheter has partnered with Service Works Global (SWG) to produce accurate building information to support redevelopment of the sports centre in Link\u00f6ping, Sweden. A 3D BIM model was created of the building, and the whole project was completed in just 11 weeks.<\/p>\n\n\n\n<p>Tim Andreassen,<strong>&nbsp;<\/strong>Technical Information Officer at Lejonfastigheter says<strong>:<\/strong><\/p>\n\n\n\n<p>\u201cWe lacked a good foundation of accurate drawings, especially for the parts of the site that have been rebuilt several times over the years.&nbsp;By digitising the entire sports centre, we now have a geometrically correct BIM model, including renovations, that we can use and keep updated over time.&nbsp;We chose SWG as a partner because they deliver materials of very high quality and have good experience of this type of project.\u201d<\/p>\n\n\n\n<p><em>This video shows the process of creating an accurate BIM model of the sports centre and how the building data can be used.<\/em><\/p>\n\n\n\n<div style=\"padding:56.25% 0 0 0;position:relative;\"><iframe src=\"https:\/\/player.vimeo.com\/video\/467696621?h=bd41b2fccf&amp;badge=0&amp;autopause=0&amp;player_id=0&amp;app_id=58479\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;\" title=\"Creating an Accurate 3D Model Using 3D Laser Scanning\"><\/iframe><\/div><script src=\"https:\/\/player.vimeo.com\/api\/player.js\"><\/script>\n\n\n\n<p>The project included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>3D laser scanning part of the building, processing the point cloud and developing a BIM model<\/li>\n\n\n\n<li>Digitising existing drawings and adding these to the BIM model, at&nbsp;<a href=\"https:\/\/www.swg.com\/insight\/glossary\/lod\/\">SWG\u2019s LoD 200<\/a><\/li>\n\n\n\n<li>All building information, including the correct relationship model, is made available in&nbsp;<a href=\"https:\/\/www.swg.com\/software\/building-information-modelling-software\/\">QFM BIM<\/a>.<\/li>\n<\/ul>\n\n\n\n<p>The client is able to access:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A geometrically correct 3D BIM model, drawings, facades and sections as well as color-coded layouts on areas and spaces for all floors<\/li>\n\n\n\n<li>Point cloud with complete navigable 3D image and correct measurements<\/li>\n\n\n\n<li>Building information available for all employees to use around the clock.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">About Lejonfastigheter<\/h2>\n\n\n\n<p>Lejonfastigheter provides Link\u00f6ping\u2019s municipal operations with properties and premises that include the sports centre.&nbsp;It is one of the city\u2019s most popular, where a large number of sports are practiced and concerts are held.&nbsp;The premises are 7,800 square meters.&nbsp;The large hall holds 2,200 spectators, of which 1,600 are seated.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Digitisation and BIM modelling of a sports centre to provide Lejonfastigheter with the correct basis for redevelopment &#8211; from start to finish in just 11 weeks.<\/p>\n","protected":false},"featured_media":6778,"template":"","meta":{"_acf_changed":false},"industry":[198],"project-type":[46],"class_list":["post-6777","case-study","type-case-study","status-publish","has-post-thumbnail","hentry","industry-bim-digitisation","project-type-bim-digital-transformations"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/case-study\/6777","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/types\/case-study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/media\/6778"}],"wp:attachment":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/media?parent=6777"}],"wp:term":[{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/industry?post=6777"},{"taxonomy":"project-type","embeddable":true,"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/project-type?post=6777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}