{"id":8378,"date":"2014-07-01T16:19:25","date_gmt":"2014-07-01T15:19:25","guid":{"rendered":"http:\/\/www.swgnew.com\/na\/news\/ostrich-dilemma\/"},"modified":"2025-06-04T09:45:54","modified_gmt":"2025-06-04T08:45:54","slug":"ostrich-dilemma","status":"publish","type":"news","link":"https:\/\/www.swg.com\/na\/news\/ostrich-dilemma\/","title":{"rendered":"The Ostrich Dilemma"},"content":{"rendered":"<p>Published in PFM magazine, a panel of FM industry experts discuss the importance of Building Information Modelling (BIM) and explain the importance of raising\u00a0awareness of BIM in the facilities profession.<\/p>\n<p>To view this article as a PDF click\u00a0<a href=\"\/na\/wp-content\/uploads\/sites\/38\/2014\/09\/BIM-The-Ostrich-Dilemma.pdf\" target=\"_blank\">here<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>JULY 2014<\/p>\n<h3>Can FMs afford to bury their heads in the sand with respect to the importance of BIM? Here\u2019s what the experts say.<\/h3>\n<p class=\"p1\">By DAVID STRYDOM<\/p>\n<p class=\"p1\">Asking somebody in the FM sector whether they\u2019re aware of building information modelling (BIM) usually elicits one of two responses: they either nod emphatically and talk about how BIM will soon be as essential as oxygen, or they look at you with a blank expression. Clearly, there\u2019s a deficit of accessible information about BIM, even though many say it\u2019s of such crucial importance.<\/p>\n<p class=\"p1\">BIM, to quote NBS information specialist Michael Smith, is a multi-dimensional tool that involves generating a visual model of the building, and which manages data about the building from the design stage, throughout the construction phase and during its \u2018working life\u2019. \u201cTypically BIM uses realtime, dynamic building modelling software working in 3D, 4D (workflow) and, increasingly, 5D (quantity surveying) to increase productivity and efficiency, save costs in the design and construction stages, and to reduce running costs, after construction,\u201d says Smith.<\/p>\n<p class=\"p1\">The real question about BIM, it seems, is whether FMs really need to know everything there is to know. Do FMs have their heads buried in the sand like ostriches when it comes to BIM? And, if so, can they afford to remain ignorant of BIM? PFM asked several experts for their opinions.<\/p>\n<p class=\"p1\">\u201cUltimately, any company involved in UK construction needs to take on-board the BIM principle,\u201d says Dan Rushton, UK commercial manager for Big Foot Systems.<\/p>\n<p class=\"p1\">\u201cFrom an FM perspective, there may be a time-lag encountering BIM, since although the use of BIM is quickly accelerating it is still a relatively new tool that is yet to be used on every project. Therefore existing properties, as well as some new buildings, may not yet have had BIM images created specifically for them. However, this looks set to change as uptake increases and it would be foolish for any FM, UK construction company or manufacturer to ignore the importance of BIM.\u201d<\/p>\n<p class=\"p1\">Rushton says BIM is important for his firm because it aims to be at the \u2018forefront of UK construction\u2019, and because Big Foot, which designs and manufactures freestanding non-penetrative systems to support plant equipment and services installed on flat roofs, provides a niche product. Rushton says Big Foot has products on the NBS National BIM library, and is making its internal systems BIM compatible. This will allow Big Foot to export into Revit, which is 4D BIM capable.<\/p>\n<p class=\"p1\">Does Rushton know of projects where BIM is being used? \u201cI had talks with a company that\u2019s involved in a major refurbishment\u00a0project for a North Wales hospital,\u201d Rushton says. \u201cThe firm is very keen to\u00a0bring the BIM aspect into their design, and is gearing up internally on newbuild and refurbishment projects. It\u2019s now looking to integrate project-specific BIM drawings into a BMS, which I hadn\u2019t considered possible before\u00a0now. Clearly, to make BIM images interactive and subsequently useful for BMSs is key for FMs.\u201d<\/p>\n<p class=\"p1\">John Starr, consultant for Excitech, says the question of whether FMs can afford to turn a blind eye to BIM is a complex one. \u201cFMs come from various starting positions with respect to this issue,\u201d he explains. \u201cSome FMs work for building owners, others work for contractor organisations. The reality is, however, that BIM buildings are being delivered, so FMs would be fools to ignore the benefits BIM can bring such as getting their buildings operational and working efficiently from day one. The information that can be provided is so much greater than previously available to them, in terms of the accessibility of formats, the quality of information and the design.\u201d<\/p>\n<p class=\"p1\">What\u2019s really interesting, however, is when FMs can be involved in the designing of the construct phases and contribute to the BIM process itself, says Starr. \u201cFMs can actually start defining what the bits of information need to be, where the packets of information and format are going to be held within BIM, and defining the flow of\u00a0information through the BIM process into their hands.\u201d<\/p>\n<p class=\"p1\" style=\"text-align: center;\">&#8212;&#8212;&#8212;-<\/p>\n<p class=\"p1\">Martin Cotterill, key account manager at Forbo Flooring Systems, says we\u2019ve all felt like burying our head in the sand at some point in our lives when the pressure gets too much, but once the problem has been tackled and overcome you often wonder what all the worry was about in the first place.<\/p>\n<p class=\"p1\">\u201cThe phenomenon that is BIM has certainly been a bit like this for some elements of the supply chain. Despite being one of the most talked about topic areas across all aspects of the built environment, the understanding and benefits are still unclear for many.\u201d Take BIM4FM\u2019s survey (2013) for example, which highlighted a significant lack of understanding on BIM and how it can be used within the built environment, with 35% of FM professionals surveyed not being familiar with the software or its uses.<\/p>\n<p class=\"p1\">BIM can best be described as \u2018the shared use of structured data\u2019 within the design, construction (or retrofit), operations\/maintenance and deconstruction of a building,\u00a0explains Cotterill. \u201cHaving been used for several years now by architects and designers for the competitive design advantages the system brings them, government has mandated the use of BIM on all centrally funded projects, set to be implemented in 2016. This will have an impact on all elements of the supply chain when designing and planning a building, as well as adopting technologies associated with BIM.\u201d<\/p>\n<p class=\"p1\">The key to understanding its importance is in the \u2018information\u2019 associated with the 3D model. Rather than being a single piece of software it\u2019s an integrated digital process providing detailed information about a project, says Cotterill. \u201cThe interesting part is that BIM means everyone involved in the construction process can work together to provide an information-rich, coordinated computer model into which all\u00a0of the construction disciplines have made their contributions.<\/p>\n<p class=\"p1\">\u201cBeing a purely digital model, the advantage is that all parties involved have access to the same detail in the same model so no need for piles of paperwork \u2013 ensuring consistency and reducing the likelihood of specification switching, which is commonly where a lot of performance issues can create problems later on in projects inevitably incurring additional costs. Indeed, all parties can benefit from good custom content models that not only give excellent visuals but also contain key technical information already \u2013 helping to make build and subsequent management easier.\u201d<\/p>\n<p class=\"p1\">As main contractors hand over building information to FMs for maintenance purposes, it\u2019s crucial FMs understand and use the detail correctly to negate performance issues related to the building, says Cotterill. \u201cThe construction industry is becoming increasingly aware that many new buildings aren\u2019t performing in accordance with the designer\u2019s vision. Design professionals are essentially commissioned to design, build and alter buildings and very rarely continue to be\u00a0involved in the monitoring of the building\u2019s lifetime performance.\u201d<\/p>\n<p class=\"p1\">Once the building is complete, designers and builders usually move to the next project, very rarely being afforded the opportunity to see how well the building they\u2019ve produced actually performs. Consequently, there\u2019s very often little dialogue or involvement between the designer and end-user on how to operate and maintain building elements efficiently.<\/p>\n<p class=\"p1\">\u201cAcross the industry encouraging work is taking place around maintenance standards, lifecycle costing and asset classification,\u201d says Cotterill. \u201cWith the on-going maintenance perspective now being more joined up, this should support the development of BIM rather than being driven from a purely design and construction position.<\/p>\n<p class=\"p1\">\u201cBIM linked to government\u2019s Soft Landings initiative \u2013 a strategy adopted to ensure the transition from construction to occupation is \u2018bump-free\u2019 and that operational performance is optimised \u2013 is a collaborative process, supported by technology that adds value by creating, managing and sharing the properties of an\u00a0asset throughout its lifecycle. \u201cPlus, the advantages for FMs are great: the reduction in waste, potential cost savings in being able to quickly and\u00a0efficiently access data for every product within a building, better visibility and intelligent FM data \u2013 all resulting in a better build and long-term\u00a0maintenance,\u201d says Cotterill.<\/p>\n<p class=\"p1\">There\u2019s little doubt BIM is here to stay and from 2016, its influence will grow yet further when the\u00a0government begins requiring suppliers to utilise BIM on all publically-funded projects, says Matt Peake, design and development manager for\u00a0Komfort, which says it is the first UK partitioning system manufacturer to offer BIM objects for its Polar Vision frameless glazed partitioning system. \u201cNow isn\u2019t the time for FMs to bury their heads in the sand; it\u2019s time for them to embrace this technology, not just because it will soon be mandatory, but because BIM offers an array of benefits that will help them run their buildings better,\u201d says Peake.<\/p>\n<p class=\"p1\">BIM may appear most relevant to those involved in the design and construction of a project, explains Peake. But its positive impact\u00a0extends across the lifecycle of a building which is why it has a key role in FM. \u201cBIM integrates information from various sources and systems to create an asset model that guides a project and contains vital design, engineering and construction information. In a sense it puts a building\u2019s DNA at your fingertips.\u201d<\/p>\n<p class=\"p1\">This knowledge is\u00a0gold dust to FMs who can use it to form decisions concerning the management of a space that drives down cost, waste and carbon emissions. In addition it provides a mine of consistent, valid data on which to base future renovation and refurbishment work. \u201cNew systems and software can seem daunting, but by collaborating and communicating with all those involved in the construction process, including suppliers, to develop a comprehensive BIM, FMs will reap the rewards,\u201d says Peake. \u201cClearly it\u2019s time to wave goodbye to your inner ostrich.\u201d<\/p>\n<p class=\"p1\" style=\"text-align: center;\">&#8212;&#8212;&#8212;-<\/p>\n<p class=\"p1\">Mark Combes, MD of Severn Partnership, says for a long time the term BIM has been a feared topic among FMs. While many have embraced\u00a0it, others still resist it and bury their heads in the sand when it comes to realising the benefits of BIM. \u201cThat\u2019s about to change with the Government Construction Strategy\u2019s plan to make level two BIM mandatory across all central government funded contracts by 2016. This means FMs need to collaborate with government\u2019s BIM task force as BIM becomes an important part of public sector projects.<\/p>\n<p class=\"p1\">\u201cUntil now BIM has largely evolved organically and primary focus has remained within the construction and design side of built environments, but as government looks towards long-term goals, we must also look to extending the knowledge and understanding of the FM profession if future adoption and technological developments are to be successful,\u201d says Combes.<\/p>\n<p class=\"p1\">So why should FMs pull their heads out the sand and embrace government plans? \u201cThe business value of BIM for FMs needs to be both clear and concise if we want to adapt or change elements of current FM procedures,\u201d says Combes. \u201cBIM offers extended business value, which includes reducing overall FM costs. By doing this, facilities become more efficient to run; and on an environmental level, carbon emissions are also reduced. In turn, buildings become safer places in which to live and work.\u201d<\/p>\n<p class=\"p1\">From the construction and design point-of-view, future renovation or refurbishments will again become more cost effective as time, effort, and unnecessary waste are eliminated through the use of structured and consistent data, says Combes. In the long term BIM will allow for smarter projects; built using lean, efficient data producing digitally managed optimum data, with sustainable results.<\/p>\n<p class=\"p1\">\u201cWe recently laser-scanned a large area of a university campus for use in site-wide refurbishment and construction work. We produced several two-dimensional CAD elevations along with accurate 3D models. These were developed and used within the university\u2019s BIM project. Working together with FMs, this collaborative BIM approach ensured the need for future reworks are reduced, stakeholders in the project\u00a0were engaged in the project early on and insurance costs were lowered, saving further investment from the university.\u201d<\/p>\n<p class=\"p1\">By modelling the campus in Revit, the creation of geometric information and inclusion of specific building information allows automatic updating of required schedules, produces instant sections, elevations, and drawing sheets all from one programme, Combes explains. This provides instant efficiency gains as well as providing information not presently available to the FM team.<\/p>\n<p class=\"p1\">But what if BIM ends up giving too much information to FMs? \u201cThe beauty of BIM is that it contains data that can always be reused and recycled and the launch of our recent sister company, SEEABLE, allows you to do this. It eliminates the need for a CAD or BIM technician and presents BIM data to anyone in an app environment, in an easy and practical way. This means that rather than burying your head in the sand and shying away from BIM, you can link your own FM database with the BIM model for a better, more accurate view of a building.\u201d<\/p>\n<p class=\"p1\">It\u2019s clear to see how BIM can be used as a catalyst for building valuable strategic bridges between FM and the wider built environment, Combes concludes. \u201cThose who continue to bury their heads in the sand and ignore it, risk being left behind by modern surveying techniques. As technology advances and visualisation of 3D data improves, the use of BIM data has never been more relevant, practical, and useful for FM. The full potential of BIM for FM is still yet to realised and bespoke visualisation products will allow this potential to be achieved.\u201d<\/p>\n<p class=\"p1\">Jack Fraser, product services director at Service Works Group, says in the past FMs were all too often thinking why should they be using BIM and now of late they\u2019re thinking how they should be using BIM. \u201cThis view is understandable when you consider only facilities professionals who are managing refurbishments or new builds will currently need to use the tool,\u201d says Fraser. \u201cThere\u2019s an argument that even facilities professionals who aren\u2019t going to use it in the immediate future, should still understand its capabilities and how it impacts the FM profession. Employers might be reluctant to train FMs in tools they won\u2019t immediately be using, but there are numerous free seminars to attend or articles to read on the topic to fully understand its impact and importance.\u201d<\/p>\n<p class=\"p1\">BIM can help create and maintain facilities that are more efficient, have lower carbon emissions, cost less to run and are better, more effective and safer places to work, says Fraser. \u201cBut FM involvement early in the process is essential for the BIM dream to be realised. So far, BIM has had\u00a0considerable support from the design and construction sectors but FMs have been slow to embrace its role.\u201d<\/p>\n<p class=\"p1\">The government\u2019s 2016 deadline is designed to reduce by 20% the capital cost and the carbon burden from the construction and operation of the built environment, and the private is sector likely to follow suit. For this reason, the entire FM sector should take note and get to grips with BIM. Burying your head in the sand is not an option, adds Fraser.<\/p>\n<p class=\"p1\">\u201cAnother reason is that BIM roll-out in the public sector is being implemented through using government\u2019s Soft Landings, which puts the end-user and the FM at the beginning of the construction process \u2013 something the FM sector has for years been arguing for. While this will add to the costs at the front-end of the projects, there should be cost savings in terms of overall delivery because the FM can help anticipate issues as part of the overall design and not have to correct them once they\u2019re operational in the built environment.\u201d<\/p>\n<p class=\"p1\" style=\"text-align: center;\">&#8212;&#8212;&#8212;-<\/p>\n<p class=\"p1\">BIM will become an integral element of the FM\u2019s role sooner than many people realise, says Derek Smith, director of strategic sales at Amtech Group, explaining why it should be welcomed. \u201cThere\u2019s no doubt BIM is a hot topic in the FM community and a 2013 survey by the BIM4FM task group showed 61.7% of respondents believed BIM can support the delivery of FM. This represents a marked increase compared to awareness 12 months\u2019 earlier. Of course, it also implies just over 38% of FMs are yet to be convinced about the usefulness of BIM.\u201d<\/p>\n<p class=\"p1\">The same survey also indicated that just over 35% of FMs don\u2019t yet understand the intricacies of how BIM will play a role in FM. This, says Smith, is the current challenge. \u201cIt may seem BIM is currently focused on design and construction phases of the building lifecycle and is therefore \u2018some way off\u2019 but there are already quite a few \u2018BIM buildings\u2019 under construction. It won\u2019t be long before those buildings have been completed and are handed over, complete with a BIM file that encompasses all the information needed to manage the building on a day-to-day basis.\u201d<\/p>\n<p class=\"p1\">Smith emphasises the 2016 government deadline as well as the fact many private sector organisations that aren\u2019t already using BIM are very close to adopting it. \u201cIn fact, early FM involvement is critical to the successful implementation of BIM and is key to government\u2019s Soft Landings approach. Consequently, he says, FMs need to push for involvement from the design phase onwards as this is the only way they\u2019ll ensure the delivery and operation of the building\u2019s purpose is considered as a key element of the design.<\/p>\n<p class=\"p1\">\u201cSuch early engagement gives FMs an opportunity to apply their own expertise and experience to a wide range of design factors, ranging from floor layouts and maintenance access for services through to choices of products, materials and finishes. Clearly, this is a very positive contrast to the traditional approach where FMs have had to manage with what they\u2019ve been given, working with very limited\u00a0operation and maintenance information.\u201d<\/p>\n<p class=\"p1\">In terms of understanding the intricacies of BIM, as referred to above, this isn\u2019t as daunting as it may seem, Smith points out. \u201cThe important thing to bear in mind is that BIM is a process \u2013 not a tool, or a software package or a database \u2013 though these will all play a role in the BIM process. This process builds a model that encompasses a host of information about the building including geometry, spatial relationships, geographic information, quantities and properties of building components and operational information.\u201d<\/p>\n<p class=\"p1\">This information can then be integrated with CAFM systems for the day-to-day operation of the building, while ensuring the BIM is updated so building information is always accurate through the life of the building. \u201cIndeed, one could argue this is the most important part of the BIM process, as the operational phase of a building\u2019s lifecycle is by far the longest and has the greatest impact on occupants. For all of these reasons, FMs need to get to grips with BIM at the earliest opportunity and ensure they stamp their mark on the facilities they\u2019ll be required to manage for many years after the building was designed.\u201d<\/p>\n<p class=\"p1\">Andy Stolworthy, product manager and BIM project leader at ASSA ABLOY Security Solutions, says BIM has the potential to revolutionise the handover process of projects; closing the gap between the architect\u2019s intent and the FM\u2019s operations. \u201cBefore BIM, FMs would often have to rely on a CAD drawing at the completion of a construction project and disparate as-built drawings from the contractor to get an insight into why architects made their initial investments. This wasn\u2019t always enough information to help them manage space efficiently and cost effectively over the project\u2019s lifetime.\u201d<\/p>\n<p class=\"p1\">Essentially, BIM has the potential to serve as an electronic operations and maintenance manual to assist FMs in maintaining the built environment, says Stolworthy. \u201cIt provides a communication portal for everyone involved in a project. Not only creating efficiencies during the planning and build stage, but also through the handover process and throughout the ongoing management of the assets.\u201d<\/p>\n<p class=\"p1\">Owing to the transfer of focus from capex to totex budgeting, architects are increasingly specifying a product based on costs that occur after an asset has been acquired, including\u00a0maintenance, repair and replacement expenditure, adds Stolworthy. \u201cSuccessful BIM delivery for FM is about communicating this original intention in an accessible and comprehensive format.\u201d<\/p>\n<p class=\"p1\">BIM objects can correctly inform architects of their options, so they may choose to make a higher initial investment in a product that can improve value for money over its whole life, by reducing maintenance costs and eliminating the need to upgrade. \u201cA BIM model will then store this information, so the architect\u2019s original focus on the whole life cost of the project is easily translated to the FM,\u201d says Stolworthy. \u201cThe BIM objects will display an asset\u2019s life expectancy, so FMs can efficiently plan their maintenance strategy.\u201d<\/p>\n<p class=\"p1\">He adds: \u201cBIM isn\u2019t a complete solution for FM; it\u2019s a process to be added to the skillset of the profession to promote best practice. If all members of the built environment supply chain begin to use BIM to its full potential, it will help the industry work together more effectively. With the declaration all new central government-funded buildings must be constructed using BIM software in tandem with government\u2019s Soft Landings, this awareness and collaboration will only become more important to ensure all buildings get delivered as promised.\u201d<\/p>\n<p class=\"p1\" style=\"text-align: center;\">&#8212;&#8212;&#8212;-<\/p>\n<p class=\"p1\">Matt Laing, product director for Manhattan Atrium says most FMs struggle with BIM because they find it difficult to bridge the gap between BIM construction models for their buildings or because they don\u2019t have models for their buildings in the first place. However, says Laing, there are software tools and processes that exist to help with both issues. \u201cWhere an FM is fortunate enough to have a construction BIM model, data transfer standards can be utilised to populate CMMS and CAFM systems with highly detailed space and asset data.\u201d<\/p>\n<p class=\"p1\">COBie (Construction Operation Building Information Exchange) is an example of such a standard and originates from the US Army Corps of Engineers, Laing explains. \u201cCOBie is supported by the UK\u2019s BIM Task Group and COBie compliant data export functions are available from the leading BIM tool providers. In short, use of COBie means the detailed asset data captured during construction can be reutilised to maintain and operate the building in its afterlife.\u201d<\/p>\n<p class=\"p1\">For those FMs without BIM construction models (the vast majority, says Laing), software tools are available that allow 3D representations of buildings to be quickly produced from existing CAD plans and textual data. \u201cThese might not contain detailed asset information on their own but when integrated with the asset information already resident in CMMS and CAFM systems, can deliver an effective way of visualising and analysing properties, collaborating in the operation and maintenance of facilities and improving accuracy. The 3D models produced this way can also directly allow optimisation of buildings in terms of energy, productivity, safety etc. via consequence of change calculation algorithms.\u201d<\/p>\n<p class=\"p1\">B I M N E W S<\/p>\n<h4 class=\"p1\">There\u2019s been plenty going on in the world of BIM. Here\u2019s a round-up of some of the more newsworthy recent developments in the UK<\/h4>\n<p>&nbsp;<\/p>\n<h2 class=\"p1\">Going mad about the model<\/h2>\n<p>By DAVID STRYDOM CBx White Paper<\/p>\n<p>In a White Paper entitled \u2018Benefiting from BIM: What are the priorities for development?\u2019, CBx says it established key findings. These included:<\/p>\n<ul>\n<li>The lack of a single, end-toend tool for design-constructoroperation creates many software coordination issues that translate into time and cost inefficiencies and prevents the full potential of BIM being realised.<\/li>\n<li>Jason Clark, director of UBS, says \u201cBIM would benefit from a larger input from FMs as a professional body going forward\u201d, to help create the \u2018pull factor\u2019 when it comes to postcompletion BIM. The industry needs their expertise on how to maximise the benefit for BIM in operation so as to facilitate the interoperability between Revit, CAFM and CMMS tools.\u201d<\/li>\n<li>The BIM process must be\u00a0streamlined; operations and maintenance (O&amp;M) manuals often get left on the shelf or underused as they\u2019re lengthy and seldom user-friendly.<\/li>\n<li>BIM post-completion could also facilitate lifecycle planning, allowing designers to check the model for likely consequences to refurbishment strategies; for example to be able to validate whether the extraction of a chiller would have detrimental effects on building performance.<\/li>\n<li>If cable management platforms could be federated into a BIM model, this would enable landlords, owners or operators to understand how the space inside a building is being used, by monitoring the usage of computers and other equipment, leading to useful insights and information on which to reduce energy performance.<\/li>\n<li>Synchronisation of datasets must be improved to decrease the resources needed to verify successive alterations through the model.<\/li>\n<li>As the industry generates and records more BIM and energy monitoring data, \u201cthere are huge opportunities for creating feedback and analysis loops between BIM, energy modelling and energy monitoring,\u201d says Brian Coffey, principle research associate at UCL and head of research at BuildLab. Another area of priority for BIM, therefore, is to develop the interfaces with various energy modelling programmes so as to encourage these types of feedback loops.<\/li>\n<\/ul>\n<h4>Severn Partnership<\/h4>\n<p>BIM could be the answer to modernising Britain\u2019s hospitals\u00a0in line with government patient legislation, according to 3D measurement expert Severn Partnership. The statement comes at a time when government has announced it will make \u00a310m available for UK hospitals to help them complete refurbishments of their maternity wards over the next few years. By utilising BIM, hospitals will be able to have whole scale refurbishments planned quickly and safely without having to cope with widespread disruption and ward closures, enabling them to continue to meet productivity targets set by the government. Nick Blenkarn, director of Severn Partnership said: \u201cHospitals are constantly dealing with increasing numbers of patients and are being expected to have patients admitted or sent home within four hours of arrival. Refurbishment projects can be very disruptive and can have a significant impact on hospital resources and response times. With BIM, development projects can be quickly and safely planned \u2013 and often delivered with no disruption at all to hospital services.\u201d Blenkarn refers to a project that Severn Partnership recently completed at Brighton and Sussex University Hospitals as an example of a quick, convenient and beneficial refurbishment project. The company laser scanned key departments of the hospital that were ready for refurbishment, creating a Revit BIM of the premises complete with internal layouts and printed elevations. A detailed survey control network was established around key points at the hospital to avoid\u00a0disruption to services, and laser scanning was extended to include surrounding areas. A final BIM model was created in parametric detail and 3D visualisations completed.<\/p>\n<h4>Airflow Developments<\/h4>\n<p>Ventilation solutions manufacturer Airflow Developments is now BIM Level 2 ready. The company says BIM was a natural progression to further improve collaboration with installers, given the government\u2019s aim for all centrally procured construction projects to be delivered using BIM by 2016. \u201cBIM offers the opportunity to reduce costs and improve delivery of projects by allowing a virtual model to be created before real installation begins,\u201d the company says, adding that it\u2019s able to supply the actual components in a format that can be placed in the virtual building, meeting with BIM level compliance, which is a requirement of the government\u2019s BIM Strategy Paper. Airflow\u2019s drawing team work with the industry standard Revit software and says it\u2019s equipped to develop BIM models specific to project requirements.<\/p>\n<h4>Carillion<\/h4>\n<p>Currently coordinating several private and public pilot projects, Carillion says it\u2019s on target to reach BIM Level 2 compliance \u2013 two years ahead of schedule. In preparation for the introduction of mandatory BIM on all government funded projects from 2016, Carillion says it\u2019s been working collaboratively to an effective BIM Level 1 standard (BS 1192:2007) for some years now. However, with Level 2 standards beckoning,\u00a0the company says it\u2019s been involved in several projects that reinforce the need to develop and share with its clients services that support the industry\u2019s drive to deliver BIM throughout the design, build and management of integrated project delivery, through the project life cycle. \u201cThe ethos of BIM is very much aligned with Carillion\u2019s values and our 2020 sustainability strategy \u2013 in which we\u2019re building a sustainable BIM capability, offering the client and owner operator an open, transparent and collaborative way of working to meet the government targets,\u201d says Alex Lubbock, BIM development manager at Carillion. \u201cAs an integrated process, BIM enables projects to be designed, constructed and maintained more efficiently and effectively enabling faster, better, cheaper and greener results. A Soft Landing service delivery has been demonstrated in recent successful pilots for clients, such as Nationwide \u2013 with the use of the BSRIA Business Focused Maintenance framework. The pilots carried out were for an existing estate, thereby showing a soft landing approach to a live operational asset and highlighting the opportunity in the retrofit use of BIM. This will enable us to learn from and develop strategies to support effective delivery and execution to enable a cultural and step change in the way we work, with the view that BIM Level 2 will be a business as usual practice in 2015 and enable us to facilitate BIM Level 3 once the infrastructure is cost effective and the standards are defined by the UK Governments BIM Task Force.\u201d<\/p>\n<h4>P C Henderson<\/h4>\n<p>Manufacturer of sliding door gear systems P C Henderson says its range of Husky products as well as its Pocket Door systems are available as BIM components that can be downloaded from the company website and bimstore. Andrew Royle, UK commercial director at PC Henderson said: \u201cWe\u2019re committed to creating quality content to ensure the specification, build process and building lifecycle is supported by the manufacturer. Continual investment in R&amp;D allows us to provide the latest, performance led solutions to answer specification demand and BIM components are crucial to this offering.\u201d Over the coming months the manufacturer says it will continue to add BIM components for all products from its range of sliding door gear solutions, in line with the government deadline. By doing this, P C Henderson says it will provide specifiers with the tools necessary to comply to state requirements, as well as to create buildings delivered on time and to budget.<\/p>\n<h4 class=\"p1\">CESABIM<\/h4>\n<p class=\"p1\">CESABIM, the catering industry library of BIM models developed by CESA, is said to be growing at a rapid rate as manufacturers and first importers sign up. Electrolux is the most recent member. \u201cWhile (the 2016 deadline) is a key driver for the move to BIM, it shouldn\u2019t be forgotten BIM is a huge opportunity for the industry,\u201d says Nick Oryino, chair of CESA. \u201cFor suppliers, it means their products and data can be compared on a like-for-like basis, including\u00a0elements such as energy consumption. For designers and operators, it will reduce construction costs and allow effective planning and control.\u201d CESABIM is a non-commercial library of BIM models and data for the catering equipment industry. The initiative has been developed by CESA in partnership with BIM specialist, Schematic. It\u2019s said to make the specification and design of kitchens easier, by using BIM models prepared to a standardised format structure and level of detail. Models for CESABIM are prepared in IFC (industry foundation class) format, which can be used on proprietary software systems such as Autoscheme, ArchiCAD, Revit etc. There are more than 150 BIM programs that support IFC files.<\/p>\n<h4 class=\"p1\">Amtech<\/h4>\n<p class=\"p1\">The second Amtech Crystal Clear BIM conference, held in London on 24 and 25 March 2014, united speakers from government and industry, providing delegates with a real-life perspective on BIM while also taking them on a journey through a real project from concept to handover and operation. As well as time for networking and browsing the Exhibitor Area, there were also opportunities for delegates to visit the BIM Knowledge Centre to see cutting-edge tools in action in the R&amp;D Zone and assess their own BIM-readiness in the BIM Assessment Zone. Delegates were able to experience the potential of augmented reality, a digitally enhanced view of the real world using a tablet device or using ground-breaking Oculus\u00a0Rift technology. \u201cFollowing the success of the first Crystal Clear BIM conference we had very high expectations of this year\u2019s event and they were certainly realised, if not exceeded\u201d said Amtech CEO Mark Tindall. \u201cI\u2019m grateful to the speakers who made the event so interesting and relevant, and the delegates who shared their views and enlivened the discussions. The feedback has been very positive and we are now exploring ways to build on this success with other events in the future.\u201d<\/p>\n<h4 class=\"p1\">Asta Development<\/h4>\n<p class=\"p1\">Asta Development has announced the availability of Asta Powerproject BIM and the ELECO BIMCloud. This new version of Asta Powerproject incorporates BIM features that will enable 4D planning, drive greater collaboration, and deliver communication, time and efficiency benefits. It enables users to link project plans and 3D models in a single, cloud-connected application, and share information between applications using the IFC4 data format. The ELECO BIMCloud, from Asta\u2019s parent company ELECO, will support improved exchange of information and collaboration between users of a number of applications used at different stages of the project lifecycle, including 3D visualisation, CAD, estimation tools and project management. It will enable the sharing of data in an industry-standard IFC4 database, hosted in the cloud.<\/p>\n<h4 class=\"p1\">ASSA ABLOY<\/h4>\n<p class=\"p1\">ASSA ABLOY Security Solutions has launched its\u00a0BIM doorset and hardware set objects. The objects have structured data attached providing a clear indication of the expected life of components in different environments. Extensive research has been carried out on these BIM objects, which has seen the installation of cycle-counters within real-life applications from schools to hospitals, in order to obtain an accurate representative of an object\u2019s life-cycle within different establishments. This information is available in the BIM object\u2019s attached data, which will, the company claims, make it easier for architects to specify products that will be of a high enough standard for continual application in particular environments.<\/p>\n<h4 class=\"p1\">Komfort<\/h4>\n<p class=\"p1\">Komfort says it\u2019s the first UK partitioning system manufacturer to offer BIM objects for its Polar Vision frameless glazed partitioning system. The objects are available in Autodesk Revit and Bentley software formats as well as an IFC file, which is used for the creation and exchange of data between different BIM software formats. Franz Lorenschitz of Komfort said: \u201cKomfort recognises the growing importance of BIM within the interior fit-out sector and providing BIM objects is a key objective for the company. Polar Vision is the first product range to go through the process and we hope to roll this out to further ranges in the not too distant future.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In this PFM cover story, FM industry experts discuss the importance of Building Information Modelling (BIM) and the importance of generating awareness.<\/p>\n","protected":false},"author":10,"featured_media":8379,"template":"","categories":[56,60],"class_list":["post-8378","news","type-news","status-publish","has-post-thumbnail","hentry","category-bim","category-fm"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/news\/8378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/users\/10"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/media\/8379"}],"wp:attachment":[{"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/media?parent=8378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.swg.com\/na\/wp-json\/wp\/v2\/categories?post=8378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}