Enquire Search

The level of detail (LoD) of a BIM model. The level required is dependant on the planned use of the model. Creating a 3D model from drawings will result in a lower LoD, but this can be enhanced by laser scanning, photography or visualization. Laser scanning produces more accurate results, and offers more choice as to the required LoD.

SWG offers three levels of detail:

  • 100 – basic structure and space
  • 200 – medium level
  • 300 – high level of detail